The HMS Shannon now has all of her standing rigging run. Next is to touch up the paint damage from running the rigging and paint the base.
I experimented with modifying the rigging sequence and found that there is a method to the madness, a very complex method.
The reason I adjusted the sequence is that the method described in the rigging manual can cause the later rigging steps to create slack in the previously installed rigging. The slack may be preventable without changing the sequence. We will see, I have plenty of ships to rig!
Sunday, June 20, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment